ADS N-12 pipe is smooth inside and available in 4 - 60 diameters, in nominal 20-ft. lengths. Pipe can be solid or perforated/slotted. Configuration is N-12 (corrugated outside/smooth inside) in 4 - 60 diameters.
If you are looking for more details, kindly visit Valor Pipe.
Pipe meets the requirements of AASHTO M-252 (3 - 10), M-294 (12 and larger), Type S (corrugated outside-smooth
Large diameter HDPE pipes are tough, lightweight, shock and chemical resistant. They offer installation economy and long service life. These pipes are available in standard lengths of 3, 6, 12 and 14m. Special pipe lengths can be produced to meet almost any need.
JDP supply fabrications from bends and junctions to complete off site solutions designed to customer specification. Please ask your local branch for more details. See also our Preformed Chambers section.
A comprehensive range of elbows, tees and bends can be manufactured to suit clients requirements.
Properties in this table are a guide only.
For more 36 Inch HDPE Pipeinformation, please contact us. We will provide professional answers.
Pipe Bedding - The bedding soil must be free from stones within the breadth of the pipe trench. On the trench bottom a 150mm thick bedding layer is prepared and well compacted. For installation in soft/wet soil, a geotextile is placed under bedding.
Pipe Laying - Pipe laying should be carried out in accordance with the latest edition of the Civil Engineering Specification for the Water Industry (CESWI). Prior to installation commencing, a site briefing to the developer and his installation contractor should be carried out.
Inspection Pipes and fittings should be visually checked for any damage immediately prior to installation.
Pipe Jointing - The pipes should be jointed in the trench and laid on the prepared bed so that the barrel of the pipe maintains substantially continuous contact. Small depressions should be made to accommodate the pipe sockets or couplings. Once the joint is complete, these depressions should be carefully infilled, taking care that no voids remain under or around the joint.
Primary Backfill - Backfilling shall be made over the whole width of the trench. Compaction of the backfill material shall be made in layers of 150-300mm. The final layer of the primary backfill should be minimum 300mm above the pipe crown. Note: No compaction is to be done directly above the pipe until the backfill has reached 300mm above the pipe crown.
Final Backfill - The final backfill is done with regard to the native soil and external loads (traffic). When deemed necessary, the compaction is carried out in several layers.
Please note this is a guide only, for full installation instructions manufacturers advice should be followed.
The company is the world’s best 18 Inch HDPE Pipe supplier. We are your one-stop shop for all needs. Our staff are highly-specialized and will help you find the product you need.