How to Operate a More Complicated Anchor Rig?

Author: Liang

May. 27, 2024

119

0

0

Mastering the Operation of Advanced Anchor Rigs

Effectively operating an anchor rig is essential for achieving successful outcomes in various projects. For technicians, it is crucial to balance efficiency and quality during this complex operation. Though anchor rigs provide considerable savings in labor and material costs, their advanced mechanization raises the bar for operational proficiency. So, what are the best practices for operating these machines?

Would you like to discover more about Tophammer drill rig For hydropower project? Reach out to us today for expert advice!


Pre-Operation Checklist

1. Prior to initiating the anchor rig, conduct a thorough inspection of the equipment. Ensuring the integrity of the pipeline through proper ventilation is necessary to prevent issues during the connection process.


Power Connection Inspection

2. Investigate the power connections for both stability and safety. It is vital to confirm that there are no leaks or risks of power failure. When examining high-altitude components, it is imperative that personnel wear safety belts and refrain from carelessly discarding tools or materials.


Site Preparation

3. Organize the worksite where the anchor rig is to be deployed. Strive to establish a level surface, adjusting all supports to ensure the rig is firmly stabilized and set to an appropriate operational height.


If you want additional details, please check out crawler drill machine.

Inspection of Drilling Tools

4. Pay close attention to the quality of the drilling tools associated with the anchor rig. Ensure that the drill pipe remains vertical and confirm that the drill bit operates smoothly and can adjust its angle properly without risk of detachment during use.


Monitoring Drilling Operations

5. While the drilling rig is operational, monitor its rotation to ensure compliance with specified guidelines. Operators and surrounding personnel should prioritize safety by maintaining a safe distance from the construction zone, adhering to distinct operating protocols based on geological conditions.


For softer soil conditions, carefully manage water pressure. Avoid aggressive advancements to prevent the drill bit from becoming lodged, as this can result in equipment damage.

Top hammer drilling rig machine 410 complete mining ...

Shipping

Shipping solutions for the selected quantity are currently unavailable

For more information, please visit china air compressor wholesaler.

Comments

Please Join Us to post.

0

0/2000

Guest Posts

If you are interested in sending in a Guest Blogger Submission,welcome to write for us.

Your Name: (required)

Your Email: (required)

Subject:

Your Message: (required)

0/2000